PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Saw Cutting across Rahway view from the 2nd Floor (800x600).jpg Excavating across Rahway Ave. Facing North (800x600).jpg Excavation for the Tele-Data connecting the Court House Facing North (800x600).jpg Installing bearing plate boxes at Stair -2-Elev. 4 (4th Floor) Facing North-West (800x600).jpg Installing shear wall panels at Stair -2-Elev. 4 (4th Floor) Facing North (800x600).jpg Installing shear wall panels at Stair -2-Elev. 4 (4th Floor) Facing South (800x600).jpg
Previous pageNext page Installing shear wall panels at Stair -2-Elev. 4 (4th Floor) Facing North (800x600)
Installing shear wall panels at Stair -2-Elev. 4 (4th Floor) Facing North (800x600)